The newer washing plant GG2 is scheduled for a rebuild to increase the RoM feed and to include the secondary wash of destoned –150mm coal which is crushed to –25mm before rewashing The fine coal is recovered on de watering screens for the –0 5 0 1mm fraction and on horizontal vacuum filters 0 1 – 0mm